Pedestrian View Of Los Angeles

This blog focuses on rail lines in LA country that exist, are under construction or under consideration. The Californian high-speed rail project and southern CA to Vegas project will also be covered. Since most of the relevant developments in the news, rail websites and blogosphere take place on weekdays, this blog will be updated primarily Monday through Friday and occasionally on the weekends. Your comments, criticism and suggestions are encouraged. Miscellaneous stuff will also appear here.

More content as you stroll down on the right side

1. Blog Archive
2.
Blog List and Press Releases
3.
My Blog List
4.
Rail Lines: Existing, Under Construction and Under Consideration
5.
Share It
6.
Search This Blog
7.
Followers
8.
About Me
9.
Feedjit Live Traffic Feed

Monday, August 3, 2009

Metro: Westside Subway Extension Project Meeting (Source: Streetsblog Los Angeles)

Link: Streetsblog Los Angeles » Metro: Westside Subway Extension Project Meeting
Metro: Westside Subway Extension Project Meeting

by Damien Newton on July 27, 2009

When
August 4, 2009 6:00 pm August 5, 2009 6:00 pm August 6, 2009 6:00 pm August 11, 2009 6:00 pm August 12, 2009 6:00 pm

The Los Angeles County Metropolitan Transportation Authority (Metro) will hold five community meetings on the Westside Subway Extension Project to provide an update on Metro’s continued progress with this project.

In April, Metro held six public scoping meetings to obtain community input to help shape the Draft Environmental Impact Statement/Report (DEIS/R) process that is currently underway.

Metro now will present a summary of what was heard during the scoping period, provide an update as Metro continues to refine the alternatives, and discuss the potential subway construction process.

A complete listing of meetings is as follows:

* Tuesday, August 4, 2009, Wilshire United Methodist Church, 4350 Wilshire Boulevard, Los Angeles. Spanish & Korean translations will be provided at this meeting.
* Wednesday, August 5, 2009, Plummer Park, 7377 Santa Monica Boulevard, West Hollywood. Russian translation will be provided at this meeting.
* Thursday, August 6, 2009, Santa Monica Public Library, Multi-Purpose Room, 601 Santa Monica Blvd., Santa Monica. Spanish translation will be provided at this meeting.
* Tuesday, August 11, 2009, Beverly Hills Public Library, Auditorium, 444 N. Rexford Drive, Beverly Hills. Spanish translation will be provided at this meeting.
* Wednesday, August 12, 2009, Westwood Presbyterian Church, 10822 Wilshire Blvd., Los Angeles. Spanish translation will be provided at this meeting.

All meetings are from 6 p.m. to 8 p.m. and are easily accessible by public transit. Parking is also available at all the locations.

The scoping meetings held in April initiate the Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR) process that was authorized by the Metro Board of Directors last January. The Westside Subway Extension is slated to receive partial funding from Measure R the half-cent sales tax increase approved by voters last November.

* Two “Build” alternatives are moving forward for analysis in the Draft EIS/EIR: a Wilshire Subway that extends the Metro Purple Line via Wilshire Boulevard
* and; a Wilshire/West Hollywood Subway that incorporates all of the Wilshire Subway and also includes a spur from the Metro Red Line in Hollywood via Santa Monica Boulevard. A “No Build” alternative and a “Transportation Systems Management” alternative are also being considered as a required part of the environmental review process.

In January 2009, the Metro Board approved the two Build alternatives for further environmental review and preliminary engineering. At the conclusion of this phase of evaluation for the project the Metro Board of Directors will be asked to select a Locally Preferred Alternative (LPA). Selection of an LPA precedes final environmental review final engineering and construction.

Content presented at these meetings will be identical so members of the public can attend on the day and location most convenient for them.

For additional information or questions, please visit the Westside Subway Extension Project web site at metro.net/westside or contact the project information line at 213.922.6934.


No comments: