This blog focuses on rail lines in LA country that exist, are under construction or under consideration. The Californian high-speed rail project and southern CA to Vegas project will also be covered. Since most of the relevant developments in the news, rail websites and blogosphere take place on weekdays, this blog will be updated primarily Monday through Friday and occasionally on the weekends. Your comments, criticism and suggestions are encouraged. Miscellaneous stuff will also appear here.

More content as you stroll down on the right side

1. Blog Archive
2.
Blog List and Press Releases
3.
My Blog List
4.
Rail Lines: Existing, Under Construction and Under Consideration
5.
Share It
6.
Search This Blog
7.
Followers
8.
About Me
9.
Feedjit Live Traffic Feed

Monday, August 10, 2009

An Alternative Pink Line through West Hollywood (Source: The Pink Line)

The Pink Line: An Alternative Pink Line through West Hollywood
Thursday, August 6, 2009
An Alternative Pink Line through West Hollywood

Last night at Plummer Park in West Hollywood there was a community forum on the progress of the Westside Subway Extension Project. (You might have noticed drills on Wilshire and Santa Monica beginning to take soil samples.) This project is in environmental review. For more information about this project, please visit Metro's website at http://www.metro.net/westside

There are still three more community forums within the next week and I encourage you to attend to learn more and to communication your support and suggestions:

• Thursday, August 6, Santa Monica Public Library, 601 Santa Monica Boulevard, Santa Monica
• Tuesday, August 11, Beverly Hills Public Library, 444 N. Rexford Drive, Beverly Hills
• Wednesday, August 12, Westwood Presbyterian Church, 10822 Wilshire Blvd, Los Angeles

All the meetings are from 6:00-8:00 PM. The material presented will be identical at each meeting (though the crowds will be different), so pick the one that is most convenient for you.

I am still very hopeful that the Westside Extension will be build with Phase 4, which includes the Santa Monica Blvd. subway through West Hollywood, also known as Alternative 11:

There have been a couple of adjustments to the Santa Monica Blvd. alignment you should know about. As you can see from the above map, there was one alignment at La Cienega and one at San Vicente. The La Cienega alignment has been eliminated because of the inability to design that hard turn. The alignment will run south via San Vicente and the stop will be on Santa Monica Blvd. between La Cienega and San Vicente, right in the heart of West Hollywood. At last night's forum there was lots of comment about how and where to design the Beverly Center area stop. There will be specific Metro forum's this fall around specific stops. If you intersted in how the La Brea, Fairfax and west of La Cienega but east of San Vicente Santa Monica stops or any other stations along the alignments are designed, be sure and attend those upcoming Fall meetings.

This project is current divided into five phases:

1. Extension of Purple Line from Wilshire/Western to Wilshire/Fairfax
2. Extension of Purple Line to Century City
3. Extension of Purple Line to West L.A.
4. Connection of Purple Line and Hollywood/Highland through West Hollywood (The "Pink Line")
5. Extension of Purple Line to Santa Monica beach.

Thank goodness Measure R passed. This will fund Phases 1 through 3. At the Forum, I asked the money question: What will determine if Phase 4 will get built? After all, there is rock support in the community for this project. West Hollywood voted 83% in favor of Measure R.

It basically comes down to money. Heavy Rail Subway is the most expensive form of transportation construction. Can Phase 4 be competitive for federal matching funds? That will be the determining factor to getting funding for this project. So start writing your letters in favor of federal funding for this project to Congressman Henry Waxman and Senators Feinstein and Boxer.

What happens if Phase 4 doesn't get the go ahead? That's pretty sad. A lot of people who supported Measure R and who support this project will be heartbroken.

There is an alternative that I have heard being whispered as a possible backup by various transit advocates. It would involve incorporating the Pink Line through West Hollywood with the Crenshaw Line project under study right now.

For more information about the Crenshaw Line project go to http://www.metro.net/projects_studies/crenshaw/default.htm

Here's a map posted on the Transit Coalitions discussion forum by Darrell:


Instead of a Heavy Rail subway like the Red Line and Purple Line, in this alignment, the Pink Line would be a Light Rail alignment line like Blue, Green, Gold and Exposition Lines. This would not necessarily be all at ground level. Portions of the Blue, Gold and Exposition lines run underground and there will be grade separated crossings at the busiest intersections.

This northern extension of the Crenshw alignment would continue light rail up from Crenshaw/Expo up Crenshaw to San Vicente and then head northwest up San Vicente and resume the Phase 4 alignment in West Hollywood.

The advantage of this alignment is that light rail is cheaper to construct than heavy rail, therefore the numbers would be more advantageous for federal funding. Also, Metro will have already invested millions of dollars studying this corridor, received feedback and comment on station locations and design, and have a whole lot of heartbroken people on their hands. There is also a regional benefit. People in Hollywood, West Hollywood, Beverly Hills and points south will more easily access LAX. Basically, West Hollywood and the Beverly Center area would be trading easier one-seat access to the Westside for easier access to LAX.

I still fully support Alternative 11 for the Westside Transit Corridor Extension Project. That is why 83% of West Hollywood voted for Measure R. I believe it is the right one for the region's future. However, while this light rail alternative may not be the most preferred or most desirable rail service to this area, it is in my opinion fully acceptable and preferable than the alternative if Phase 4 is not constructed, which is nothing.

Posted by Dan Wentzel at 8:48 AM