Pedestrian View Of Los Angeles

This blog focuses on rail lines in LA country that exist, are under construction or under consideration. The Californian high-speed rail project and southern CA to Vegas project will also be covered. Since most of the relevant developments in the news, rail websites and blogosphere take place on weekdays, this blog will be updated primarily Monday through Friday and occasionally on the weekends. Your comments, criticism and suggestions are encouraged. Miscellaneous stuff will also appear here.

More content as you stroll down on the right side

1. Blog Archive
2.
Blog List and Press Releases
3.
My Blog List
4.
Rail Lines: Existing, Under Construction and Under Consideration
5.
Share It
6.
Search This Blog
7.
Followers
8.
About Me
9.
Feedjit Live Traffic Feed
Showing posts with label Stimulus Money. Show all posts
Showing posts with label Stimulus Money. Show all posts

Tuesday, July 21, 2009

Quentin Kopp: HSR is "Organic Green" (Source: California High Speed Rail Blog)

Link: California High Speed Rail Blog: Quentin Kopp: HSR is "Organic Green"
Monday, July 20, 2009

Quentin Kopp: HSR is "Organic Green"

Responding to a silly Examiner editorial espousing neo-Hooverite claims about the high speed rail project, former CHSRA chairman Quentin Kopp has an op-ed today defending the HSR project against claims it is "pork":

The latest editorial suggests that federal stimulus dollars to the high-speed rail project are attributable to backroom, smoke-filled dealings with Speaker Nancy Pelosi. Such leaps of logic would be silly and worth a chuckle or two if not so dangerous in misinforming California residents. On the contrary, federal stimulus dollars will provide needed impetus to our dreary economy. Moreover, California is in the pole position for those critical dollars thanks to decades of vital work by the California High-Speed Rail Authority....

Don’t politicize high-speed rail and lambaste it in some overarching dissatisfaction with the U.S. stimulus bill. “Track to Nowhere” may be an easy, sophomoric chant, to which millions more will chant back, “Build, baby, build.” Construction of a high-speed train system constitutes the premiere opportunity for California to lift itself into the 21st century. I’ll put my faith in independent residents of California who understand the benefits of high-speed rail, not as a partisan policy position but as a nonpartisan solution for our state’s stressed transportation system.


Kopp is right to put his faith there, in the same voters who were bombarded with right-wing distortions and lies about HSR in 2008 and still voted to approve HSR and $10 billion in bonds. Voters understand very well the need for economic recovery, for sustainable transportation, for high speed trains. Republican, right-wing claims that this is "pork" have gained hardly any traction at all with the public. But kudos to Kopp for pushing back against the nonsense anyway.

Posted by Robert Cruickshank at 10:26 PM


Monday, July 20, 2009

Now Is The Perfect Time To Build A Railroad (Source: California High Speed Rail Blog)

Link: California High Speed Rail Blog: Now Is The Perfect Time To Build A Railroad
Sunday, July 19, 2009

Now Is The Perfect Time To Build A Railroad

What do the Golden Gate Bridge, Shasta Dam, and the Central Valley Water Project have in common? They are all products of the Great Depression. At a time when both California and the federal government were strapped for cash and suffering the effects of a major economic downturn, government decided to use infrastructure projects to provide economic recovery in both the short and the long term. Each project continues to provide economic activity 70 years later. Each has paid for itself many times over.

Last fall we spent a lot of time on this blog debunking the New Hoovers who claimed that now was the wrong time to build high speed rail - that despite the clearly successful model of the big 1930s infrastructure projects, California should embrace austerity and follow a different path, even in spite of the need and economic benefit of high speed trains. Here in the summer of 2009 we find that this attitude persists. However, as the enormous scale of the recession has become undeniable, the New Hoovers have had to find another reason to argue against infrastructure projects. As Dan Walters shows in the Sacramento Bee today, the state budget mess is providing the new excuse for New Hooverism:

Is this the time to launch construction of a high-speed railroad line between Northern and Southern California that will cost at least $40 billion, much of it from bonds to be repaid from a state budget that's already gushing red ink?

Yes, say its fervent advocates, contending that a bullet train, similar to those in Europe and Japan, will reduce air and auto congestion, reduce greenhouse gases and generate many billions of dollars in economic benefits.

Walters doesn't give his opponents or HSR much credit. He ignores the effect of those "many billions of dollars in economic benefits" - does he think that the state of California or its budget can afford to turn down the jobs and tax dollars that come from the HSR project? Construction workers' pay is taxed, as is their spending. HSR saves travelers time and money, creating a Green Dividend that fuels economic growth through the savings that sustainable mass transportation creates.

Instead he seems to be arguing from an embrace of misery. His preferred solution to the economic crisis appears to be lowered horizons and mass suffering. To Walters, the budget crisis means that all plans and projects that would spend money must be shelved. Presumably they'll await economic recovery, but that recovery will not occur without those infrastructure projects. Since the phrase "economic recovery" appears to be banned in Sacramento, among both politicians and the media that cover them, it isn't surprising that Walters embraces misery for misery's sake. Suffering and pain will somehow produce recovery - that's the neo-Hooverite model that Walters espouses in his column.

Most of Walters' column is devoted to rather weak attacks on the HSR project that suggest he is simply not very familiar with the key details of the project:

Bullet train advocates have been touting California as qualifying for a significant portion of the $8 billion set aside in federal stimulus money for transit because of the bond issue.

Recently, however, the feds decided to place the Los Angeles-Las Vegas high-speed route promoted by Nevada interests, including Senate Majority Leader Harry Reid, in the California system. It raises the specter that huge sums would be spent to make it easier for Californians to spend money in Las Vegas casinos.



In fact, the LA-Vegas HSR project does not appear eligible for HSR stimulus money. Nevada's application for stimulus funds was limited to $1 billion to study maglev from Primm to the Las Vegas Strip, a project that Senator Reid no longer supports. Secretary of Transportation Ray LaHood has repeatedly stated the SF-LA HSR route is the most likely to receive HSR stimulus funds.

The criticism continues, however, questioning both whether a high-speed rail system makes transportation and economic sense and the route adopted by the California High-Speed Rail Authority, especially running trains over the unpopulated Pacheco Pass between San Jose and the Central Valley....Meanwhile, opposition to the Pacheco Pass route appears to be growing because it would mean routing trains down the bucolic San Francisco Peninsula between San Francisco and San Jose. The alternative would be to run trains over the Altamont Pass along Interstate 580 into the Stockton-Tracy area, a more heavily traveled commuter corridor.



But since the alternative route, over Altamont Pass, would have bypassed San Jose entirely, the Pacheco route actually has far more people living along it than Altamont. The fact that nobody lives in the Pacheco Pass itself is actually an argument FOR that alignment, as it means fewer stops for a train whose purpose is to whisk travelers from the Bay Area to Southern California in the shortest amount of time possible. If the goal was to design a commuter railroad, then Altamont would indeed be a preferable choice - which is exactly why the California High Speed Rail Authority plans to develop Altamont as a high speed corridor.

Environmental activists in Palo Alto are complaining about the impact on their city and, somewhat mysteriously, language appeared in still-pending revisions to the 2009-10 state budget that makes allocation of $139 million in high-speed rail planning funds contingent on "alternative alignments" being considered. Advocates of the Pacheco Pass route consider that to be a poison pill and will try to get it removed before a final budget is enacted, if that ever occurs.

Peninsula NIMBYs are a nuisance to the project, and are putting their own personal aesthetic values in alliance with neo-Hooverism in order to block economic recovery. Their opposition is unsurprising and annoying, but it's not a reason to doubt the economic value of the project.

While $9 billion of the voter-approved bond issue is to be used for the system, if and when it is ever built, the remaining $995 million can be spent on local mass transit systems on the assumption that they will improve access to high-speed rail.

There is a suspicion among those who chart the erratic course taken by the bullet train project that when push comes to shove, its only tangible fruit will be those local projects.

Only someone who has paid just passing attention to the HSR project would consider its course "erratic" - the CHSRA is well along the path of finalizing environmental documents, determining the project-level design, and has already built working relationships with the leading HSR experts around the world. Winning voter support for the project AND the $10 billion in bonds it needs to get started was no small accomplishment. And with President Barack Obama and most of the Congress on board, HSR is far from a pipe dream. It is a real plan with a bright and viable future.

But it's understandable why those who have chosen to deny the future would choose to deny the value and viability of the HSR project. For people like Dan Walters, the state's economic and budget crisis means we must lower our horizons and suffer until somehow, apparently through magic, we have economic recovery. For the rest of us, who believe economic recovery is desirable and that it can be produced through infrastructure as it was 70 years ago, the high speed rail project is a necessary part of the project to rebuild California. It's a shame Dan Walters, who has spoken so insightfully in other venues about the need to rebuild California's broken political system, chooses to eschew vision and planning in favor of a morose neo-Hooverism.

Our predecessors did not listen to that kind of talk when planning the Golden Gate Bridge or the Central Valley Project. Nor should we.
Posted by Robert Cruickshank at 7:20 PM


City Council Greenlights Alternate Plan for Rail Yard (Source: www.surfsantamonica.com)

Link: City Council Greenlights Alternate Plan for Rail Yard
City Council Greenlights Alternate Plan for Rail Yard

By Jorge Casuso

July 17, 2009 – The City Council Tuesday voted to move ahead with a plan that would relocate parts of a proposed light rail maintenance yard despite opposition for neighboring residents and some businesses.

The plan includes using a city-owned parcel at 1800 Stewart Street and a Santa Monica College-owned parcel, as well as the originally proposed site currently owned by Verizon near Olympic and Stewart streets.

The council voted 4 to 2 -- with the four Santa Monicans for Renters’ Rights (SMRR) council members present backing the plan and Bob Hollbrook and Bobby Shriver opposing it -- to pursue the alternative and to continue to explore other possible sites and ensure community involvement.

The move to relocate the noisier functions of the Exposition Light Rail Maintenance facility further away from homes in the Pico Neighborhood came after SMRR opposed the proposed Verizon site on Exposition Boulevard earlier this year.

In a letter to the council, the powerful tenants groups called placing the facility across from an apartment building a case of “environmental injustice,” and warned that the facility would have “many intolerable impacts” on the city’s poorest and most ethnically diverse neighborhood.

The council vote came after a consultant hired by the City to explore alternative sites “confirmed that there were no other sites. . . that met the criteria, particularly with respect to size and ownership,” according to staff.

But the alternative plan failed to please the two dozen residents who testified that it did not adequately address health and safety issues – one neighborhood leader said it created a “toxic triangle" – and that it would snarl traffic on Stewart Street.

Mayor Ken Genser noted that the yard, which would service trains that run on the second phase of the line from Culver City to Downtown Santa Monica, would have little or no impact on health, since the cars are electric and do not pollute.

The plan also was opposed by officials at the Lionstone Group, a real estate investment firm that has a ground lease with the City until 2030 for the land at 1800 Stewart.

"Our ground lease is not for sale and we will actively oppose any effort to take our lawful right to use that for the next 21 years," said Daniel Dubrowski, a founding partner of Lionstone.

College officials, on the other hand, said they are willing to give up the adjacent college-owned student parking lot if the City helped them find an alternative site. The council directed staff to help the college relocate the parking lot.

Shriver, who cast one of the two opposing votes, said the City should continue to look for an alternate site, which should not be difficult to find in today’s economic climate.


High-speed rail isn’t pork — it’s an organic green (Source: San Francisco Examiner)

Link: High-speed rail isn’t pork — it’s an organic green Opinion Articles - Editorials on Top News Stories | San Francisco Examiner
Opinion

High-speed rail isn’t pork — it’s an organic green

By: Quentin L. Kopp
Special to The Examiner
July 20, 2009

In 1986, I was elected to the California Senate from my home district as an independent — an event not achieved in the state Senate since 1878. In part, my election (and re-election two times) was attributable to my record of protecting public tax dollars and a philosophy and practice of fiscal restraint, responsibility and accountability.

As such, I took great umbrage at the July 9 Examiner editorial entitled, “High-speed rail projects are about pork, not transit.” Such peckish pap. What’s more befuddling for regular readers, the same editorial page has opined in the past in support of high-speed trains, urging the 800-mile system not be derailed.

The latest editorial suggests that federal stimulus dollars to the high-speed rail project are attributable to backroom, smoke-filled dealings with Speaker Nancy Pelosi. Such leaps of logic would be silly and worth a chuckle or two if not so dangerous in misinforming California residents. On the contrary, federal stimulus dollars will provide needed impetus to our dreary economy. Moreover, California is in the pole position for those critical dollars thanks to decades of vital work by the California High-Speed Rail Authority.

Just since 2000, the system has received a certified statewide program environmental impact report and statement under state and federal law, following thousands and thousands of government agency and citizens’ comments and hundreds of public meetings reviewing the project. Cooperation with regional transportation agencies such as BART and Caltrain to integrate the high-speed rail and local and regional commuter systems for the benefit of the public is unceasing. The general alignment and station locations have been chosen for a majority of the system, designed to carry millions of passengers at speeds up to 220 mph by 2030.

Yet another critical environmental document has been certified, establishing Pacheco Pass as the preferred high-speed train route connecting San Francisco and the Peninsula with the Central Valley, while pursuing a partnership with local regional transit agencies to develop a joint-use high-speed rail infrastructure project in the Altamont Pass corridor. The Authority has also created an institutional structure to manage construction of high-speed train infrastructure and technology adaptable to California’s unique needs, and launched a program for comprehensive long-term management of operations and assets of a fully functioning system. Project level environmental work and analysis has commenced throughout the first phase of the project to Anaheim, and here in the Bay Area a draft scoping report capturing 995 public comments has been released.

Securing federal grants represents one part of a financing plan that shares responsibility between local, state and federal governments together with significant private equity investment. That’s not pork. It’s USDA prime.

Yet another indicator of the lean and mean condition of the project is the passage of Assembly Bill 3034 (Cathleen Galgiani, D-Livingston) signed by Gov. Arnold Schwarzenegger, which includes significant project and financial oversight and other taxpayer protections.

California residents overwhelmingly supported Proposition 1A, a down payment on an economically viable and environmentally essential transportation improvement for a burgeoning population with bursting travel demands and needs.

Don’t politicize high-speed rail and lambaste it in some overarching dissatisfaction with the U.S. stimulus bill. “Track to Nowhere” may be an easy, sophomoric chant, to which millions more will chant back, “Build, baby, build.” Construction of a high-speed train system constitutes the premiere opportunity for California to lift itself into the 21st century. I’ll put my faith in independent residents of California who understand the benefits of high-speed rail, not as a partisan policy position but as a nonpartisan solution for our state’s stressed transportation system.

Retired Judge Quentin L. Kopp is a member of the California High-Speed Rail Authority.


Monday, June 15, 2009

From KCBS San Jose: Still No Regional Consensus on High Speed Rail

KCBS - Still No Regional Consensus on High Speed Rail
Still No Regional Consensus on High Speed Rail



SAN JOSE (KCBS) -- Although the mayors of the Bay Area’s two largest cities agree on the priorities for high speed rail, some cities between San Francisco and San Jose harbor reservations about the project.

Leaders in several peninsula cities are concerned about the impact trains running 120 mph will have on the quality of life in communities adjacent to the existing Caltrain right of way.

Listen KCBS' Mike Colgan reports
Audio link: http://podcast.kcbs.com/kcbs/1794645.mp3

“The track design, for example in Palo Alto, would run right up to or in some cases potentially need to take some of people’s back yards,” said Palo Alto City Councilman Pat Burt.

Burt said communities up and down the peninsula could find themselves divided by large, physical barriers to mitigate noise and danger from the engines.

Such discord could jeopardize federal funding for the rail line that would eventually connect Los Angeles, San Francisco and Sacramento with the Central Valley.

A unified plan will ease the competition for stimulus dollars in particular, said San Jose Mayor Chuck Reed.

“It’s really important for us all to work together because we want to make sure that high speed rail, the California part of high speed rail, has the best chance possible,” Reed said.


Wednesday, June 10, 2009

From LAist.com: Feds Give LA Millions in Transit Money

Link: Feds Give LA Millions in Transit Money - LAist
Feds Give LA Millions in Transit Money


If it hasn't already (photo taken in 2007), this bus stop at Jefferson and La Cienega could use some improvements | Photo by Fred Camino via Flickr

The U.S. Department of Transportation announced that $400 million from the economic recovery package is headed to make capital investments in transit throughout California. It's not going to build us the Subway to the Sea or anything sexy like that, but is headed to more functional improvements, such as seen in the above photo:

* $1,030,644 to Metro for Bus Stations/Stops Improvements
* $225,085,056 to Metro to purchase replacement buses, perform bus overhaul, widen Red Line rail stations egress, replace fiber optic equipment for train stations, replace Metro Blue Line TPSS
* $8,185,197 to Metro for Traction Power Substation Replacements Along the Metro Blue Line
* $4,522,269 to the city of Torrance for the Purchase of 8 Replacement 40-foot Alternative-Fueled Buses

user-pic
By Zach Behrens in News on June 10, 2009 10:30 AM


Thursday, June 4, 2009

Shovel Ready” High Speed Rail? CA Is Ahead of the Game

Streetsblog » “Shovel Ready” High Speed Rail? CA Is Ahead of the Game
Shovel Ready” High Speed Rail? CA Is Ahead of the Game

by Damien Newton on June 4, 2009


Photo: Sacramento Bee

Yesterday, Vice President Joe Biden, met with governors from eight different states that are competing for High Speed Rail funding. Streetsblog's D.C. Correspondent wrote a story about the national implications of the meeting available at our New York site. While neither Schwarzenegger nor another representative from California was present, there was good news for California. From today's Times,

"The reason why California is looked at so closely -- it's been a priority of your governor, it's been a priority of your Legislature, they've talked about it, a lot of planning has been done," Biden said in a conference call with reporters.

The vice president said the administration wants "to get shovel-ready projects out the door as quickly as we can. . . . So California is in the game."

In other words, because California has been working on the San Francisco to San Diego High Speed Rail Corridor, and because voters put up funds for the project in the form of bond money; we have a leg up in applying for federal funds as the Obama Administration makes them available.

And let's be clear, it's not as though the entire corridor were "Shovel Ready" but there are two sets of track that the California High Speed Rail Authority says are ready to go. The first is local, as the state could connect Los Angeles to Anaheim at a cost of $3 billion. The second corridor would connect San Francisco to San Jose at somewhere between $4 billion and $5 billion.

Back when the federal stimulus was first passed, Ben Fried out of our New York office wrote a pretty brutal takedown of the final bill that I re-posted at the LA Streetsblog. Supporters of California High Speed Rail were upset for obvious reasons and I defended Fried's post in the comments section by saying.

But that so much of the negotition was done in Harry Reid's office (to the point that Pelosi actually pitched a fit about it according to Politico) and he's already talking about funding for the gamblin' train to Las Vegas, I am mighty sceptical that much, if any, of that money is going to end up being spent on the line we supported last fall. If it does, I'll do a mea culpa post and you can all "I told you so'd" me. I've certainly been willing to do them in the past.

Well, let's just say I'm not quite ready to eat crow just yet, but I got it marinating. In this case, the crow would taste awfully good.
2 Comments
Last comment by Andy K Leave a comment »

1.
Post Thumbnail
Gary Kavanagh

Choo choo!! I've had my moments of doubt, but I had high hopes for this and it looks like CA may well become home to the first proper high speed rail system in the United States. Woo hoo!
June 4, 2009 at 10:31 am Link # 1
2.
Post Thumbnail
Andy K

So, $8 billion for these first short segments, which leaves $32 billion for the rest of SJ to LA. Doesn't add up, does it? I know, these two segments are in urban areas, but even these cost seem unrealistic. At $5 billion, the SF to SJ segment is about $80 million per mile. Seems low - many bridges will need to be built, substations installed, etc, etc.

I'm all for improving our rail systems, however these unrealistic estimates do a real disservice. It makes it hard to make good decisions when estimates are so faulty.

Am I missing something?
June 4, 2009 at 11:11 am Link # 2

Tuesday, June 2, 2009

Council Unanimously OKs More Shopping for the Westfield shopping center in Century City. Westfield's plans call for designating a location for a subway stop should the Metro Purple Line, the Jimi Hendrix Line, be extended to the Pacific Ocean

Council Unanimously OKs More Shopping | NBC Los Angeles
Council Unanimously OKs More Shopping

Updated 1:30 PM PDT, Tue, Jun 2, 2009



This is the future you ... after tomorrow's Alice + Olivia trunk show, of course. Yes, you really will be that happy-go-lucky.


The expansion of the Westfield shopping center in Century City, a plan that calls for condominiums and more retail shops and parking, was unanimously approved Tuesday by the Los Angeles City Council.

The $800 million project, which calls for a 39-story tower with 262 apartments and condos, was given the OK without discussion between council members.

Westfield's plans call for moving Bloomingdale's to the condo tower, adding 1,900 parking spaces and designating a location for a subway stop should the Metro Purple Line be extended to the Pacific Ocean.
Related Stories

In 2005, Westfield made over the center's movie theaters, dining terrace and added retail shops to the second level of the mall.

Westfield expects the center to generate $8.1 million a year in tax revenue -- up from the current $6.7 million -- once the work is completed in 2013.


Copyright City News Service

Sunday, May 31, 2009

Korean companies eye U.S. bullet train project

The Korea Herald : The Nation's No.1 English Newspaper
Korean companies eye U.S. bullet train project

Korean train manufacturing companies and government agencies are eyeing a $45 billion bullet train project by the U.S. state of California, officials said yesterday.

The Korea Trade-Investment Promotion Agency said it has signed a memorandum of understanding with state-run Korea Railroad Corp. to support about 10 Korean companies planning bids for the project.

"We are planning to put our efforts towards helping Korean companies win the project, acknowledging the size of the project and its impact on enhancing the nation' status," Kotra president Cho Hwan-eik, said.

The list of Korean companies includes POSCO Engineering & Construction Co. and Hyundai Rotem Co., officials said.

The California state government plans to inject billions of dollars into constructing a high-speed railway that would operate train services at up to 350 kilometers per hour.

California is expected to open the bidding process at the end of the year.

Leading countries in the global train market like Germany and Japan have already begun promotional activities, reports here said.

Korea has been seeking business opportunities in the Middle East and Latin America.

The government of Abu Dhabi is planning to hold a public tender for a $30 billion metro train project. The Brazilian government is also looking to build a $9 billion bullet train project.

Transport Minister Chung Jong-hwan has recently visited Brazil and has asked the Latin American government to cooperate in supporting Korean businesses making inroads into the country.

By Cho Chung-un

(christory@heraldm.com)

US transport boss: Spain's trains are US' model

The Associated Press: US transport boss: Spain's trains are US' model
US transport boss: Spain's trains are US' model

By HAROLD HECKLE – 1 day ago

MADRID (AP) — Spain's bullet train system is a model to follow as America plans how to spend the money the government is injecting to stimulate the economy, the U.S. transportation secretary said Saturday.

Ray LaHood said the $8 billion allocated for high-speed railways in the United States will spur economic growth and reduce greenhouse gas emissions.

President Barack Obama has cited Spain, France and Japan as countries with systems worth emulating.

The Spanish network is likely to interest the U.S. government because its specially designed, electrified tracks — first devised for the French TGV system — are not as expensive to lay and run as some German or Japanese alternatives.

And Spanish state-of-the-art tunneling technology has proved successful in boring efficiently through mountain ranges to reach the cities of Valladolid and Malaga.

LaHood met with Spain's Prime Minister Jose Luis Rodriguez Zapatero to discuss how investing in such a train system could stimulate job creation in the U.S.

"Yesterday I traveled on a train at close to 350 kilometers (215 miles) per hour, the fastest I've ever ridden on a high-speed train," LaHood said. He said he had enjoyed a conversation and beverage aboard and found the experience very civilized.

"Our leaders have made the decision that America will have high speed rail," LaHood said.

Of $787 billion approved in Obama's stimulus bill, $48 billion is destined to improving overall transport infrastructure, with rail receiving for the first time an important share, LaHood said.

He said that by the end of the summer there will be American people working in well-paying jobs building high speed rail links in the U.S.

The U.S. transportation secretary also met with Spanish Development Minister Jose Blanco. The two discussed how rail can be tailored to provide "intermodal links" with other forms of transport such as road, air and sea, as well as issues relating to safety on a high speed network.

The secretary said he was scheduled to meet with Vice President Joe Biden next week in Washington D.C. to decide how best to spend the $8 billion allotted to high speed rail. He said there would be "an early infusion of money to get things going."

Spain's high-speed train system began operating in 1992 between Madrid and Seville in the southwest. Since then the network has been extended by nearly 2,000 kilometers (1,250 miles) to link central Valladolid and Segovia to southern Malaga and northeastern Barcelona.

By 2014 bullet trains are expected to travel from Portugal's capital, Lisbon, to Madrid in under three hours.

High-speed lines will eventually stretch from Portugal's Atlantic coast, through France to Britain and Belgium, providing Europe with fast passenger transport to rival air travel.

Copyright © 2009 The Associated Press. All rights reserve

California High Speed Rail Competes for Federal Stimulus; Benefits from State Bond Approval - Login Required

The Planning Report - California High Speed Rail Competes for Federal Stimulus; Benefits from State Bond Approval - Login Required
California High Speed Rail Competes for Federal Stimulus; Benefits from State Bond Approval
New funding and federal political support has High Speed Rail Authority Executive Director Mehdi Morshed daring to dream.

For Californians anticipating a high speed rail system connecting Northern and Southern California, November’s Proposition 1A, the Obama Administration’s commitment to high speed rail, and recent federal monies are making the project more attainable than ever. While critics of the project’s viability still exist, TPR/MIR presents the following interview with the executive director of the California High Speed Rail Authority, Mehdi Morshed, who provides a comprehensive status report on the proposed system.

Published Friday May 29, 2009

Thursday, May 28, 2009

Federal Officials to Hear California's Plan for High-Speed Train and Conventional Rail Integration

Federal Officials to Hear California's Plan for High-Speed Train and Conventional Rail Integration
May 27, 2009 08:37 PM Eastern Daylight Time
Federal Officials to Hear California's Plan for High-Speed Train and Conventional Rail Integration

--(BUSINESS WIRE)--California High-Speed Rail Authority:

What:
Federal Railroad Administration Workshop on High-Speed Rail in America


Who:
Federal Railroad Administration Representatives
Caltrans Director Will Kempton
California High-Speed Rail Authority Representatives


When:


Thursday, May 28, 2009

1 p.m. to 4:30 p.m.


Where:


Sacramento Marriott Hotel Rancho Cordova

11211 Point East Drive

Rancho Cordova, CA


Details:
The Federal Railroad Administration will hold one of seven regional workshops in Sacramento as part of the agency's implementation of President Obama’s vision for an American network of high-speed trains. The federal agency is charged with establishing guidelines for use of $8 billion in federal stimulus funding for high-speed rail and intercity passenger rail development.

California is the only state in the country that already has in place $9 billion in voter-approved financing, environmental clearances and an adopted route for a true high-speed train. Caltrans Director Will Kempton and California High-Speed Rail Authority officials will outline the plan for California's 800-mile system, linking major cities with service up to 220-miles-an hour, as well as the conventional intercity and commuter rail systems that will link to it.

The FRA is expected to announce its interim guidance for grant proposals on or before June 17, 2009.

Tuesday, May 26, 2009

High-speed rail proposal is viewed with concern

High-speed rail proposal is viewed with concern
High-speed rail proposal is viewed with concern

Issue Date: May 27, 2009

By Christine Souza
Assistant Editor


Visualization showing an option for grade separation at Shaw Avenue in Fresno. NC3D of Portland, Ore., is working with the California High Speed Rail Authority to provide visuals of the proposed high speed rail project.

As the state's High-Speed Rail Authority plans an 800-mile high-speed rail system that will help alleviate congestion on roadways and transport passengers from San Francisco to Los Angeles in a little over two and a half hours, California's agricultural landscape is likely to change dramatically.

An estimated 300 miles of the project is expected to go through the Central Valley—one of the most productive farming regions in the world.

"There has been a real concern by agriculture about the route that the California high-speed rail project ends up taking and how it is going to impact those properties, as well as properties adjacent to the proposed project corridor," said Andrea Fox, California Farm Bureau Federation governmental affairs legislative coordinator. "While the routes of the project are being planned, we cannot lose sight of the many benefits of California agriculture, not only to support the state and nation economically, but to feed people locally and around the world."

The train, which would travel at speeds of up to 220 miles per hour, was a major topic of discussion this month at the Great Valley Center's annual conference, entitled "20/20 Foresight, A View of the Great Valley in a Decade."

Quentin Kopp, chair of the California High-Speed Rail Authority and former state senator, addressed attendees about the project.

"California has been identified as having 38.2 million people, according to the State Department of Finance. The experts advise us that California high-speed rail is tantamount in terms of supplying a means of transportation to 50 million Californians by the year 2030," Kopp said.

After failing to pass a high-speed rail system on the statewide ballot in 2006, California voters approved a high-speed rail project last November with the passage of Proposition 1A that authorized $9.95 billion in general obligation bonds to fund the first phase of a planned multiphase high-speed rail network.

Kopp mentioned that $9 billion worth of bond funds will be directed to construction of the project and the remaining $950 million is for entities such as Bay Area Rapid Transit in the Bay Area to connect to the high-speed rail. Federal funds, including federal stimulus dollars, as well as other federal grants, have also been made available for high-speed rail projects nationwide. A few billion dollars more is expected to come from local, regional and even private sources, Kopp said. Total cost of the first phase of the project, which will include high-speed train lines from San Francisco to Anaheim, via the Central Valley and through Pacheco Pass, is estimated to be $45 billion.

The California High-Speed Rail Authority is tasked with completing final planning, design and environmental efforts. Construction efforts are projected to begin as soon as 2011.

The route that connects Los Angeles to San Francisco, via California's Central Valley, will be the first phase of the network.

"Three hundred miles of the project lie in the Central Valley and indeed is a critical part of the whole system," said Robert Schaevitz, vice president of Decision and Implementation Services with URS Corporation, the project manager for the Fresno-to-Palmdale section of the project. "The highest speeds on the system will be in the Central Valley where there is the least conflict with the difficult terrain except for a couple of important exceptions—Fresno and Bakersfield. We're working in the Central Valley to make sure that every mile that we can will have that 220 mph top speed."

An area between Merced and Madera counties is being looked at as the potential site of one of California high-speed rail's heavy maintenance facilities. Merced County Farm Bureau Executive Director Diana Westmoreland Pedrozo foresees this project as creating real problems for the future of agriculture in the Central Valley.

"Unless the state has some real land-use rules to be attached to this project, it will be a nightmare for agriculture," Pedrozo said. "So far, my local, regional and state governments have not given me any confidence in their ability to actually protect and preserve our ability to feed our future generations and ourselves. You are talking about the only place on earth that can do what we do."

Heading farther south, Schaevitz said, one of his biggest challenges is getting the project through Bakersfield.

"The existing railroad system there was laid out many years ago, so it is very, very tight. If we are going to keep our high speed going, we cannot stay with the freight rail lines," he said.

Matthew Park, executive director of the Kern County Farm Bureau, said the county Farm Bureau has been meeting with leaders of the project.

"Kern County Farm Bureau is at the table in the discussion with the project managers. Even just a rough diagram through the City of Bakersfield runs into all kinds of problems," Park said.

Park confirms that the high-speed rail project will likely change the look of agriculture in the county, but it is too early to know what acres will be impacted.

The leaders of the project held a series of public scoping meetings throughout the Central Valley communities including Merced, Madera, Fresno, Visalia and Bakersfield, in which 442 people registered. That process yielded over 150 written comments from the public.

Schaevitz has a long list of considerations when conducting environmental studies and one of them, he said, is the impact on agricultural land and the local economy. When weighing alignment options for this high-speed rail project, one consideration is to take as little prime agricultural land as possible, he said, but "in some limited cases the structure, for various reasons might actually be up in the air, and in other cases we might have to purchase a 50-foot right-of-way and take off corners of property."

"CFBF supports the concept of mass transit, but we must insist on protecting agricultural land and preventing urban sprawl. Because our success depends on a healthy environment, we are committed to solutions that work," Fox said. "Considering California's projected $21.3 billion budget deficit and the existing $100 billion bond indebtedness, coupled with the need for new water projects and improvements to existing transportation and other infrastructure, we are concerned about cost-effectiveness of this project."

For more information about the California High Speed Rail project, go to www.cahighspeedrail.ca.gov.

(Christine Souza is an assistant editor of Ag Alert. She may be contacted at csouza@cfbf.com.)

Permission for use is granted, however, credit must be made to the California Farm Bureau Federation when reprinting this item.

Saturday, May 23, 2009

Obama's Stimulus Projects Won't Amount to Major Infrastructure Overhaul

Obama's Stimulus Projects Won't Amount to Major Infrastructure Overhaul
By Amanda Ruggeri
Posted May 22, 2009

source, just click here.

Describing the $787 billion stimulus package, President Obama evokes the 1950s construction of the interstate system, conjuring images of highways, bridges, and orange cones. "Throughout our history, there have been times when a generation of Americans seized the chance to remake the face of this nation," he said last month. "And that's what we're doing today: building a 21st-century infrastructure."
People Who Read This Also Read

*
Antimatter & Destruction: Particle Physics Plays Central Role in Angels & Demons 24673066
*
Obama Aides: Cheney Is Just Rehashing Old Bush Administration Fights 24701390
*
10-Week Workout: Talking Motivation With Matthew Reeve 24700336
*
Obama is Right: Cheney and Bush Fell For Bin Laden's Terrorist Trick 24677584
*
How Obama Is Revamping America's Cars 24630780

Recommendations by Loomia

But as projects are chosen, it's becoming clear that the program may amount to little more than an infrastructure face-lift. Owing to the need for speed and to institutional obstacles, most stimulus transportation projects are small and localized. "Here and there, people will notice things," says Robert Poole, director of transportation policy at the libertarian Reason Foundation. He cites repaired potholes and new streetlights. "But I don't think the country as a whole will say, 'Wow, transportation is so much better,' " Poole says.

This stems from the law's main purpose: creating jobs quickly. It prioritizes projects that will be completed within three years. Major highway construction typically takes 13 years from start to finish, reports the Federal Highway Administration.

So more than three quarters of the approved highway projects' funds will go to repaving and widening roads, while less than 6 percent will pay for new construction, according to the investigative nonprofit ProPublica. Other reports show that smaller, rural projects, like bridges, often receive funding priority over those that might get more traffic, largely because they can be launched more quickly.

That doesn't necessarily make the spending ineffective. One quarter of major urban roads, for example, are in poor condition and would benefit from repairs. But it does mean that few projects will have sweeping effects.

One project that experts say could be "transformational" is limited by a lack of funding. High-speed rail, which Obama says could benefit 10 major corridors between cities around the country, was slated for $8 billion in the stimulus, and Obama has asked Congress for $5 billion more over five years. But the Government Accountability Office estimates that constructing high-speed rail between Los Angeles and San Francisco alone will cost about $33 billion. Similarly, while the American Association of State Highway and Transportation Officials estimates that the nation's highways and bridges need an annual investment of $166 billion through 2015, the stimulus package has only $27.5 billion. Overall, the law allots $48.1 billion to the Department of Transportation, or just 6 percent of total stimulus funds.

An even bigger problem, experts say, is how that funding is doled out. Decisions are often politicized and are rarely coordinated between levels of government. Transportation dollars are traditionally spread thinly, "like peanut butter," says Robert Puentes, senior fellow in the Brookings Institution's metropolitan policy program. "We don't do cost-benefit analysis in this country." That is a systemic problem, unrelated to the stimulus. But it could be addressed in the next big infrastructure battle. The so-called highway bill, which maps out funding for the country's roads, bridges, and transit over the next five years, is due to be reauthorized this fall. America may not have a clear vision for its transportation system, but infrastructure advocates, not to mention Americans who have ever sat in stalled traffic or bumped over a pothole, hope that will change.

Thursday, April 23, 2009

No Stimulus money for the California to Vegas Meglev train

Plan for stimulus dollars makes no mention of California to Vegas train | plan, barstow, stimulus - News - Desert Dispatch
Plan for stimulus dollars makes no mention of California to Vegas train
Comments 2 | Recommend 0
Proponents still hope to get funding
April 20, 2009 - 3:55 PM
By ABBY SEWELL, staff writer

BARSTOW • The Obama administration’s strategic plan for spending the $8 billion in stimulus funding allotted to high-speed rail projects makes no mention of a proposed rail line from Anaheim to Las Vegas that would stop in Barstow.

Project proponents are still hopeful that some of the funds may come their way.

The plan released Thursday by President Barack Obama and U.S. Department of Transportation Secretary Ray LaHood lists 10 designated high-speed rail corridors where projects are eligible to receive funding, none of which include the Anaheim to Las Vegas route.

A California corridor connecting the Bay Area with Sacramento, Los Angeles and San Diego is one of those listed in the plan.

In addition to the $8 billion designated for high speed rail in the stimulus plan, President Obama proposed to create a $1 billion per year grant program for high-speed rail projects.

The funding approach proposed in the strategic plan would allow stimulus dollars to be used to build “ready to go” projects with preliminary engineering and environmental work completed, to develop corridor-wide proposals, or to fund the planning process for corridors not yet ready for construction.

Bruce Aguilera, chair of the California-Nevada Super Speed Train Commission, which is tasked with moving the Anaheim to Las Vegas train project forward, stated via email that the project proponents still plan to file a request for stimulus funds and expect to be eligible.

“We have a plan and (are) moving fast to have the first leg built during the president’s first term,” Aguilera wrote.

Lori Irving, a spokeswoman with the U.S. Department of Transportation, said projects that are not located in the existing corridors may still be eligible to compete for some of the stimulus funds.

The Barstow City Council voted March 31 to take an official stance supporting the Anaheim to Las Vegas train proposal, known as the California-Nevada Interstate Maglev Project. The proposal would involve running a high-speed train using magnetic levitation technology along the route, with stops in Ontario, Victorville, Barstow, and Primm, with its central maintenance yard to be located in Barstow.

The first leg of the project, as proposed, would run from Las Vegas to Primm, at an anticipated cost of $1.3 billion. The total cost of the 268-mile route is projected at $12 to $15 billion.

The project had already been designated for $45 million in federal funds prior to the stimulus package, but proponents need to find 20 percent matching funds before the federal money can be released.

The City Council also agreed to voice its opposition to a competing proposal, the privately funded DesertXpress, which would run from Victorville to Las Vegas without a stop in Barstow.

The transportation department is required to issue a full set of application guidelines by June 17, and the Obama administration expected to announce the first round of grant awards before the end of the summer.

Contact the writer:
(760) 256-4123 or asewell@desertdispatch.com


In this article: stimulus monies at work and a sign of increasing coverage of State's proposed high-speed rail

Sacramento railyard makeover finally in motion - Sacramento News - Local and Breaking Sacramento News | Sacramento Bee
Sacramento railyard makeover finally in motion
ShareThis
By Tony Bizjak
tbizjak@sacbee.com
Published: Thursday, Apr. 23, 2009 - 12:00 am | Page 1A

For years, it seemed nothing would happen in the barren space that is the downtown railyard. Today, Sacramento finally sees the launch of a much-awaited makeover of the massive downtown railyard site.

Crews begin laying the base for three major roads and two bridges in downtown Sacramento's northwest corner, setting in motion what developers say will be the biggest urban infill project in the country.

"This is a historic moment," said Suheil Totah, the Sacramento head for Atlanta-based railyard owner Thomas Enterprises. "This is the beginning of the future of (downtown) Sacramento."

But, in keeping with the project's history of fits and starts, today's launch remains shadowed by financial uncertainty.

To start construction, the Thomas development company was forced to front funds by leveraging some of its properties in other parts of the country, representatives said.

But it's counting on tens of millions of dollars in promised state infrastructure bond funds to keep the project on track, and more in city and federal funds this year.

"The sooner, the better," Totah said Wednesday after a nail-biting winter when the state, in a budget crisis, froze funding for this and other projects.

State officials recently began selling bonds to finance projects. The railyard was identified Wednesday among the California projects that will receive their promised funding; however, state finance officials said that money won't start flowing for at least a month.

The Thomas company will host a formal groundbreaking ceremony today for what is expected to be a 20-year community-building project.

When done, officials say, the 240-acre site will nearly double downtown's size. It will be home to thousands of residents, hundreds of businesses, anchored by a major train and transit center, possibly including bullet trains to Los Angeles and the Bay Area.

And, although a basketball arena is not currently part of the plan, some officials hope the centrally located redevelopment site may yet be a future home for the Kings.

The project's first phases involve constructing extensions of Fifth and Sixth streets and two bridges over the Amtrak and freight rail tracks.

Developers also plan to build the site's major east-west road – Railyards Boulevard – connecting a rebuilt Jibboom Street to the west and Seventh Street to the east.

Work has to start now, despite the down economy and uncertain financing, so the developer and the city can meet a $20 million deadline in December.

The foundations of the two bridges need to be in place by then so the city can begin moving the passenger and freight tracks to a new site in the railyard.

The federal government appears poised to forward $20 million in economic stimulus funds for that move, if the project is ready to start by December.

City officials have their fingers crossed.

"Everything hinges on the track relocation," the city's Fran Halbakken said.

The prognosis is so minute-by-minute that even as Totah was touring the construction site Wednesday, he was receiving funding updates from Halbakken on his BlackBerry.

Rep. Doris Matsui, D-Sacramento, said Wednesday that she is pleased that construction finally will begin. She believes that the project financing "is going to be OK" but warned that she and other government officials must continue to push to make sure that the project doesn't stall.

"Everybody has to keep their eye on the ball," Matsui said. "We have to keep it going because if it stops, it is difficult to get it going again."

So far, $288 million in public funds from local, state and federal sources has been authorized for the project's roads and utilities, as well as the track move and a new transit facility at the south end of the railyard – an indication of the project's economic importance to the city and state.

City officials have not yet decided what role the existing historic train depot will play when the tracks are moved a few hundred feet north but say they intend to keep the depot in some way a part of the new transit center.

Despite the promise of government funds, and support from Gov. Arnold Schwarzenegger, the downturn has made it difficult for builders to say how fast construction can move.

"If funds are available, you can be driving here by next year," said Elias Rashmawi of Thomas development.

It doesn't mean there will be much reason to drive through the railyard for a few more years, until businesses begin to arrive, he acknowledged.

Once Fifth and Sixth streets are connected to downtown, workers are expected to begin rehabilitating the locomotive shops on site.

The shop building nearest to Fifth Street is planned to become a farmers market, similar to the Ferry Building in San Francisco and the Oxbow Market in Napa. Thomas Enterprises representatives say they are in talks with the developer of those two Bay Area projects.

When asked this week, project officials said there is still room on site for a professional basketball arena.

Earlier site plans had included an arena, but those were tossed aside after voters rejected a public-financing plan. The National Basketball Association currently is working with state officials on a plan to build an arena at Cal Expo, but Totah of Thomas Enterprises says his company is open to reconsideration of an arena on its site.

"We'd be very interested in including it," Totah said Wednesday. "We can still do that."

His company faces another potential stumbling block.

Two years ago, it agreed to sell the lower 33 acres of the site to the city for its transit center. The sides, however, are far apart on a price.

The dispute is scheduled for arbitration this summer.


Sunday, April 5, 2009

Stimulus money for California high-speed trains capable of 220 mph and expected to link San Francisco and Los Angeles

Siemens onboard for high-speed trains in China | Cutting Edge - CNET News
March 20, 2009 2:45 PM PDT
Siemens onboard for high-speed trains in China
by Erik Palm


The Obama administration isn't the only one looking to high-speed rail lines.

German train producer Siemens has inked a $1 billion contract to build 100 new high-speed trains for China, the company announced Friday.

The company's Velaro train has a top speed of 218 mph. A typical train will have 16 cars and carry more than 1,000 passengers. With a total length of more than 1,300 feet, the new trains will be the world's longest single high-speed units in use, according to Siemens.


Japan and European countries such as France have had high-speed train systems for decades. But now the race to build such trains seems to have taken off in two of the leading world economies, the China and the U.S.

In the U.S., the Obama administration wants to invest $1 billion dollars a year over the next five years in high-speed rail. In addition, the stimulus bill (PDF) contained $8 billion in capital assistance for high-speed rail corridors and intercity passenger rail service.

Among the projects angling for a slice of the stimulus money are California high-speed trains capable of 220 mph and expected to link San Francisco and Los Angeles in as little as two and a half hours. California voters authorized $9.95 billion for the project last year.

At the same time, China plans to create the world's largest high-speed rail network. The Chinese Ministry of Railways is planning to buy around 1,000 high-speed trains within the next few years. The current order from Siemens includes the first trains to serve the new high-speed line between Bejing and Shanghai.

The train will complete the 825-mile run between Bejing and Shanghai in a mere four hours. The Chinese Ministry of Railways already has 60 trains in the Velaro style in use--among other things for transportation between Tianjin-Beijing during the Olympic games last year.

With a consumption of only 0.33 liters per seat for every 100 kilometers traveled (712 mpg), the Velaro is the most environmentally friendly high-speed train on the market, Siemens claims.
Erik Palm, a business reporter for Swedish national television, is joining CNET News as a spring 2009 fellow with Stanford University's Innovation Journalism program. When he's not working, he enjoys kayaking and exploring California's hiking trails. E-mail Erik.