Pedestrian View Of Los Angeles

This blog focuses on rail lines in LA country that exist, are under construction or under consideration. The Californian high-speed rail project and southern CA to Vegas project will also be covered. Since most of the relevant developments in the news, rail websites and blogosphere take place on weekdays, this blog will be updated primarily Monday through Friday and occasionally on the weekends. Your comments, criticism and suggestions are encouraged. Miscellaneous stuff will also appear here.

More content as you stroll down on the right side

1. Blog Archive
2.
Blog List and Press Releases
3.
My Blog List
4.
Rail Lines: Existing, Under Construction and Under Consideration
5.
Share It
6.
Search This Blog
7.
Followers
8.
About Me
9.
Feedjit Live Traffic Feed
Showing posts with label Metro Orange Line. Show all posts
Showing posts with label Metro Orange Line. Show all posts

Tuesday, May 17, 2011

Metro Orange Line Extension (www.metro.net)

Metro Orange Line Extension


Overview:

The Metro Orange Line Extension will extend four miles north from Canoga Station to the Chatsworth Metrolink Station. This dedicated busway will offer improvements to north-south mobility in the western San Fernando Valley by connecting activity centers along the corridor and connecting the Metro Orange Line with Metrolink.

The construction of the Metro Orange Line Extension will offer faster travel times, improved bus connections, and provide better access to destinations throughout LA County.

Metro Orange Line Extension features include:

  • A four-mile northern extension of the Metro Orange Line, extending from the Canoga Station to the Chatsworth Metrolink Station

  • Four new stations to be located at Sherman Way, Roscoe Blvd., Nordhoff St. and the Chatsworth Metrolink Station. New platforms to be added at Canoga Station

  • New bikeway and pedestrian path that will run parallel to the dedicated busway

  • Landscaping similar to that on the existing Metro Orange Line

  • New park and ride lot at Sherman Way Station

  • Additional parking at Chatsworth Station

  • Overcrossing of Lassen St. and the railroad tracks on an elevated bridge

  • Forecast to open summer 2012

  • All stations include public art

MAP:



Monday, August 3, 2009

New Bus Line will Take Passengers from SCV to NoHo (Source: LAist)

Link: New Bus Line will Take Passengers from SCV to NoHo - LAist
New Bus Line will Take Passengers from SCV to NoHo


Photo: Fred Camino
A new bus line between the Santa Clarita and the NoHo Metro Red/Orange Line stations will begin service next week. This is actually a pretty good idea for the fourth largest city in Los Angeles County as Metrolink trains run between the city and downtown, but only six days a week as opposed to the NoHo Express, which will run everyday. Additionally, this delivers commuters to a transit hub. Service will begin on August 1st with the first two weeks completely free of charge. Then if riders want to ride for the rest of the month for free, they can take an online survey to give feedback on the route. Wow, immediate feedback and evaluation so they can improve service right away? Imagine if all government agencies did that?
user-pic
By Zach Behrens in News on July 30, 2009 10:59 AM


Wednesday, May 27, 2009

Orange line was a missed opportunity for light rail

Orange line was a missed opportunity for light rail - LA Daily News
Orange line was a missed opportunity for light rail
By John Reynolds John Reynolds is a Canoga Park resident who studied urban and regional planning at University of California, Davis.
Updated: 05/26/2009 06:32:09 PM PDT

The Orange Line busway has been a success and there are many good reasons to expand the service. Unfortunately, the Orange Line is also a story of opportunities lost, and the planned expansion of the line north to Chatsworth illustrates both the success of the line and its challenges.

One concern about the northward expansion of the Orange Line deals with the businesses that will be forced to relocate from along the old Southern Pacific right-of-way. Many of these businesses leased their land from the Southern Pacific and coexisted with the railroad literally in their backyard. It is unfortunate that the busway requires much more land than the railroad did. This is just one of the many impacts that has resulted from the decision to build the Orange Line as a busway instead of a light-rail system.

In 1989 I began studying transportation issues as related to urban planning. For one of my classes I researched and presented a report comparing traditional bus systems and light-rail systems that included a cost-benefit comparison.

It is true that light-rail does have a comparatively high initial cost compared with traditional buses. But that truth has many qualifiers. Putting buses on a specially built, private right-of-way changes the equation significantly. Beyond the roadway there are vehicle maintenance and replacement costs. A more difficult computation concerns the cost of the commute time for the distance traveled.

The cost to install pavement is considerable and almost equal to the cost for rail, not including overhead power. The Metropolitan Transportation Authority has already had to repave portions of the Orange Line, suggesting any cost savings have been decreased.

Buses have very significant maintenance costs and a remarkably short operating life. Most buses last only 10 to 12 years. This should be compared with rail vehicles that have an operating history of 50 years or more - just look at the New Orleans trolleys, for example.

One of the modern concerns has been carbon dioxide and its contribution to global warming. Most buses burn fossil fuels, creating a significant number of pollutants, of which carbon dioxide is just one. Most light-rail vehicles use electric power, in which it is easier to control the environmental impact.

Noise is another environmental pollutant of concern. The Orange Line has required the construction of sound walls to control the noise from the tires and the engines. The electric propulsion of light-rail equipment is almost silent, as is the rail and wheel contact.

The Orange Line busway has had many problems with accidents between buses and automobiles. Part of the problem concerns a confusing set of signals at many intersections and impatient drivers running the red signals. The MTA has tried to reduce this by slowing the buses down or having them stop at some intersections, which has significantly increased the travel time on the line.

If the line had been built as light-rail, those intersections would have been protected with signals and crossing gates. At certain intersections it would have been reasonable to build bridges so that the automobile traffic would not have been inconvenienced at all by the transit vehicles. Complete grade separation would allow the light-rail vehicles to travel faster and significantly reduce the time needed to get from Woodland Hills to North Hollywood.