Pedestrian View Of Los Angeles

This blog focuses on rail lines in LA country that exist, are under construction or under consideration. The Californian high-speed rail project and southern CA to Vegas project will also be covered. Since most of the relevant developments in the news, rail websites and blogosphere take place on weekdays, this blog will be updated primarily Monday through Friday and occasionally on the weekends. Your comments, criticism and suggestions are encouraged. Miscellaneous stuff will also appear here.

More content as you stroll down on the right side

1. Blog Archive
2.
Blog List and Press Releases
3.
My Blog List
4.
Rail Lines: Existing, Under Construction and Under Consideration
5.
Share It
6.
Search This Blog
7.
Followers
8.
About Me
9.
Feedjit Live Traffic Feed

Wednesday, June 16, 2010

L.A. Gets Moving on Transit

Link: http://americancity.org/buzz/entry/2390/

L.A. Gets Moving on Transit

Credit: prayitno

Ever since an earmark for the construction of a bridge to Gravina Island was slipped into the 2005 transportation bill, government spending of all types has been derided by conservatives with a reference to the “bridge to nowhere.” TheNational Review, for example, asked derisively last year why one bridge to nowhere is a national embarrassment while 1,000 bridges to nowhere are a stimulus.

Infrastructure projects, in particular, have become objects of ridicule for conservatives, rather than examples of investment for the public good. The bigger and more ambitious the project, the more of a waste it is presumed to be. So Louisiana Governor Bobby Jindal proved when he mocked the stimulus package’s “$8 billion” for “a magnetic levitation line from Las Vegas to Disney Land.” His liberal use of facts – for starters, the $8 billion went to numerous high-speed rail projects scattered throughout the country – further reveals his implication: such a project couldn’t possibly be a good use of taxpayers’ money.

But Los Angeles Mayor Antonio Villaraigosa is contesting the myth of the wasteful infrastructure project by hatching a transit expansion scheme that combines cost-effectiveness and job creation with an ambitious challenge to Los Angeles’s auto addiction.

In May, Villaraigosa traveled to Washington for the fifth time in three months to lobby for his 30/10 transit proposal. The plan would use federal funds – some combination of interest rate subsidies, loan guarantees, and direct loans, among other possible mechanisms – to speed the construction of twelve transit lines included in Los Angeles’s long-range transportation plan from thirty years to just ten.

The Mayor has argued his case persuasively, emphasizing the project’s environmental and economic significance along with its mobility and livability benefits for Angelenos. The transit expansion itself, even if not accelerated, has much to recommend it: 200 million fewer driving miles annually, 570,000 fewer pounds of emissions annually, and 80 million more transit trips each year. If accelerated, the plan would create 170,000 construction jobs over ten years, contributing to the economic recovery of a county with almost 600,000 unemployed workers. Additionally, 30/10 would save $3.8 billion by avoiding cost inflation already calculated into the transportation plan’s price tag while steering clear of the nasty parochial disputes that can derail a project when a transit system is expanded in piecemeal fashion. Finally, the Los Angeles County Economic Development Corporation estimates that the non-accelerated transit expansion would increase federal tax revenue by $2 billion, state tax revenue by $800 million, and local government revenue by $60 million over 30 years. An accelerated plan would likely have a similar fiscal impact but more quickly, providing revenue at a time when cash-strapped governments are starved for resources.

Not least important, 30/10 is designed to be revenue-neutral for Washington: Los Angeles will pay the federal government back for its assistance with revenue from a half-cent sales tax it passed to pay for the expansion.

At a time when Los Angeles is struggling to recover from the economic downturn, accelerating the city’s transit expansion would provide an immediate – and lasting – jolt to the region’s economy that would be felt statewide.

These benefits explain why California’s two senators and Los Angeles’s congressional delegation have expressed their support for the program and given Villaraigosa such a warm welcome in Washington. But the Mayor’s plan has also been greeted positively by several members of Congress who are themselves less invested in California, includingtransportation heavy hitters like Minnesota Representative Jim Oberstar and Oregon Representatives Peter DeFazio and Earl Blumenauer. 

30/10 will not itself turn around Los Angeles’s economy, let alone that of the entire country. But with such a significant impact on the mobility, environment, and economy of the nation’s second largest metropolitan area by population and the world’s nineteenth largest economy, the project has national significance. Such impact turns heads even in Washington, especially when lawmakers consider the big infrastructure projects they would like built in their own districts and states. 

Indeed, perhaps more important than 30/10’s economic or environmental consequences is its significance as a model for the federal government’s engagement with cities, an engagement that President Obama has insisted must be robust. Villaraigosa has very deliberately and very publicly campaigned for 30/10 (he has testified before congressional committees twice and visited DC to lobby for the plan on at least three other occasions), assiduously avoiding the accusation that he is simply looking to tuck the plan into an appropriations bill where no one would ever find it (it’s too big and too complex for that, anyway). He describes 30/10 as an investment that Los Angeles will repay to the federal government, emphasizing that Angelenos have done their part by passing the half-cent sales tax that will permit the City to pay the feds back in full.

The message is that the new era of partnership between the federal government and cities will often involve not only commitment from local governments but flexibility from Congress and the White House when policy innovation and progress demand action. (It is no surprise that the most sensible structure for funding 30/10 is an infrastructure bank that could provide a menu of different financing mechanisms.)  In particular, it will involve Congress and the White House listening to city leaders and determining how, as Villaraigosa put it to me several months ago, “to leverage what cities are doing around the country.”

The White House Office of Urban Affairs, an innovation of the Obama administration, could be useful here, presenting and promoting ambitious but practicable urban programs to Congress and federal agencies. The good works of Transportation Secretary LaHood notwithstanding, there is simply no official elected or appointed who is institutionally capable of promoting transit and other policies that are good for cities generally. This is particularly true within Congress, which is dominated by non-urban politicians who almost by rule favor projects that benefit a small portion of the population.

The goal would be a federal government flexible enough to promote and facilitate replication of model local policies, thus avoiding some of the trickiest problems that arise when trying to come up with a one-size-fits-all federal urban agenda. This would work very well for transit, which would immediately benefit from a high-level champion who could lobby for the national importance of regional and local transportation alternatives. But it could also work for local environmental programs with high upfront costs that save money over the long term, local anti-homelessness and anti-poverty initiatives that address the needs of specific populations, and local efforts to preserve and construct affordable housing. This would happen alongside the more fundamental work that must be done to end the anti-urban bias that plagues federal and state policymaking in areas like transportation, housing, and the environment.

Some have pointed out 30/10’s warts, including the absence of funds for operating costs and the plan’s very ambition, which the Los Angeles County MTA calls “feasible, but aggressive.” 

Such critics miss the point. 30/10 represents a paradigm shift in how we think about infrastructure investment, which we inevitably assume to be slow, expensive, incremental, and wasteful.  Villaraigosa’s plan, in contrast, strives for speed, cost efficiency, and scale. It is exactly the type of project that the federal government needs to support if it hopes to reorient itself toward cities. 

30/10 is an opportunity to debunk the myth of the inevitably wasteful infrastructure project and banish the dreadfully hackneyed phrase “bridge to nowhere” from political discourse.

Harry Moroz is a research associate at the Drum Major Institute for Public Policy. Harry is a contributor to the The HuffingtonPost and has written for the Philadelphia Inquirer, The Atlantic, and DMIBlog where he writes frequently about housing and urban policy.

Extension of the Gold Line from Pasadena to Azusa is set to have its official ground breaking on Saturday, June 26 (Source: http://www.foothillretailcorridor.com)



Local Focus: Gold Line Extension

 

The extension of the Gold Line from Pasadena to Azusa is set to have its official ground breaking on Saturday, June 26 at 10:00 AM at Newcastle Park (101 West Colorado Boulevard, just west of Santa Anita) in Arcadia.

 

A lot has been happening on this project, even though you don’t see anything right now.  In October, Metro adopted their Long Range Transportation Plan which included funding for Phase 2A of the Gold Line extension. Phase I was from downtown L.A. to Pasadena; Phase 2A is from Pasadena to Azusa; Phase 2B is from Azusa to the transit center in Upland; and eventually Phase 3 will run from the transit center to Ontario Airport.

 

In March the Metro board approved the Funding Transfer and Master Cooperative Agreements. This essentially assured over $800 million toward the project between 2010 and 2019.

 

Here is a project that has gained my attention for a few reasons. I’ve always loved trains, and it is quite enjoyable to take the Gold Line to the beautiful and historic Union Station in downtown L.A. (From there it is a short walk to Phillipe’s, home of the original French dip sandwich!). But this project has a bit of sentimentality to it. The Gold Line runs along the old Santa Fe right of way. I remember when the Super Chief would pull into the Pasadena station. The Santa Fe rail line was completed in 1887 line and ran from Los Angeles to San Bernardino. Much of the development along the Foothills can be traced to the development of rail stations along the way. The pictures above are of the San Dimas and Monrovia stations today. Hopefully the Monrovia station will be lovingly restored like the San Dimas station. I’m so glad that Pasadena preserved their old station.

 

Look for transit oriented development to occur near each of the Gold Line stations. Phase 2A will have stops in Arcadia, Monrovia, two in Irwindale, and two in Azusa.

Chinese, German and Spanish High-Speed Rail Systems to be Featured at U.S. High Speed Rail Association Conference in L.A. June 17-18 (Source: )

Link: http://www.prnewswire.com/news-releases/chinese-german-and-spanish-high-speed-rail-systems-to-be-featured-at-us-high-speed-rail-association-conference-in-la-june-17-18-96375669.html
Chinese, German and Spanish High-Speed Rail Systems to be Featured at U.S. High Speed Rail Association Conference in L.A. June 17-18
 
 

Siemens, Talgo, Renfe and other global companies will share rail partnership experiences

LOS ANGELESJune 15 /PRNewswire/ -- America's high-speed rail future will draw from the expertise of potential international partners, and evolving high-speed rail projects in ChinaGermany and Spain will be among those featured at the U.S. High Speed Rail Association Conference in Los Angeles beginning June 17.

Across the globe, international governments and private companies are designing, building and successfully operating and expanding high-speed rail systems, and exporting that technology to new entrants. In China, as an example, nearly 1,200 miles of high-speed rail lines carrying trains capable of traveling 200 mph and faster are opening this year alone, extending a massive green transportation system being expedited in that country.  And in Spain, which hopes to have a high-speed rail station within 30 miles of most Spanish citizens in 10 years, high-speed trains already are navigating a varied geography through an impressive network of tunnels.

"We're fortunate and excited that executives from companies involved in high-speed rail projects in ChinaGermanySpain and across the globe will be joining us at High Speed Rail: 2010 to profile their projects and showcase what's possible here in the United States,'' said Andy Kunz, Chief Executive Officer and President of the U.S. High Speed Rail Association.

The two-day conference at the Hilton Universal City will include global rail industry executives, as well as policy makers, civic leaders, transportation officials and business people from across California and the United States.  The conference will explore a range of topics aimed at providing a closer look at plans, processes, pathways and potential for a high-speed rail system in California and other parts of the U.S.

"The train is rounding the track for high-speed rail in California and the U.S., and these global leaders will help deliver the blueprint, best practices and master plan for HSR in America," said Thomas A. Hart, the U.S. High Speed Rail Association's vice president for government affairs.

Among confirmed participants:  California Transportation Secretary Dale BonnerJuan Matias Archilla, Director International Projects for Renfe; Petra Todorovich, Director – America 2050; Jo Linda Thompson, HSR Policy Advisor and Executive Director for the Association of California High Speed Trains; Judge Quentin L. Kopp, board member for the California High Speed Rail Authority; Katherine Perez, ULI Los Angeles; Frank Guzzo, Director of Business Development - Siemens Mobility; Antonio Perez, CEO Talgo, Spain; and more.

For conference program information, log on to: http://www.ushsr.com/events/california2010.html

SOURCE U.S. High Speed Rail Association

Back to top

Tuesday, June 15, 2010

Construction On Expo Line Said To Continue For Another Year (Source: http://blogs.uscannenberg.org/neontommy)

Link: http://blogs.uscannenberg.org/neontommy/2010/06/construction-on-the-expo-line.html


Los Angeles

Construction On Expo Line Said To Continue For Another Year
TrackBacks (0) Comments (0) Bookmark and Share

Construction for the Exposition Light Rail Transit Line began more than three years ago.

The Expo Line aims to provide an alternate travel option to the consistent traffic on the I-10 freeway. 

Phase 1 of the project, which broke ground in 2006, will produce an 8.6 mile track with nine stops from Downtown L.A. to Culver City.

"We are supposed to be working on this for another year," said construction worker George Hernandez, who was working at the Expo/USC stop. "But I doubt we'll be done."

Though multiple electrical and construction companies are working on the project, electrician Mike Johnson said, "There just aren't enough men out here working every day."

Gabriela Collins, a representative from the Exposition Construction Authority, said the Expo Line will be operating from Downtown L.A. to the La Cienega Boulevard stop next summer. 

"In summer 2011, the light rail will be open and operating from 7th Street to La Cienega," she said. "Unfortunately the last stop in Culver City on Venice Boulevard is trailing behind. We are projecting that it will be finished in late 2011 and open in early 2012."

Phase 2 of the Expo Line, which would go from Culver City to Santa Monica, is projected to be complete by summer 2015, Collins said. 

3 Comments

No, "we are supposed to be working on this for another year" is hardly definitive. What does that mean? Exactly 365 days from today? Approximately one year? Okay then, does that mean 11 months, or 14 months? There's a big difference between those two concepts. Is there an actual opening date set in stone right now, or at least a temporarily fixed date?

He may have some inside info, probably more than the average outsider, but he is not a definitive source. Someone higher up in Expo should have been quoted also. And if you couldn't reach them, then you should have said that representatives from the Expo Construction Authority could not be reached for their comment.

mattapoisett in la on June 15, 2010 4:48 PM

Sam,

Talking to and Identifying your source is fine. It gives the reader sufficient information about the source. The worker may have been a site manager who is clued into the schedule or just a very smart aware employee.

What I hate is when the real reporter talks to the construction worker and identifies them as a source close to the project.

As for the ID on Gabriela, It is correct. I don't see how you can find fault with it.

S.S. Sam Taylor on June 15, 2010 3:21 PM

A student reporter who has no idea about what to report. For starters, you don't go out and get quotes from the construction workers. Their job is to build, not comment on the schedule of the project. How would they have any idea?

But, even worse, the student reporter couldn't even get the title of the Expo representative correct or to challenge the misinformation from the employees that had no business talking to the press, as that isn't their job or skillset.

This is sad and pathetic. Phenia, an F is the best you deserve. Poor. Embarassing. Yikes.

Monday, June 14, 2010

DesertXpress Projects 2011 Construction Date (Source: www.cahsrblog.com)

Link: http://www.cahsrblog.com/2010/06/desertxpress-projects-2011-construction-date/

DesertXpress Projects 2011 Construction Date

Jun 8th, 2010 | Posted by Robert Cruickshank

That’s the report from the San Bernardino Sun:

Proponents of a high-speed train that would link this High Desert city to Las Vegas say they are confident that the impending completion of environmental and financial plans will allow construction of a new rail line to begin in 2011.

“There will probably be at least some type of ground breaking, but the heavy construction will begin in 2011,” Desert Xpress president Tom Stone said by teleconference on Thursday.

This is great news – seeing HSR construction actually under way in California would be a huge boost to the SF-LA project. There’s nothing quite like seeing steel in the ground to make a project real, to show the public this is actually doable.

Of course, that’s assuming they get their financing. DesertXpress is still keeping that information under wraps, but the SB Sun article did give some indications where their funding may come from:

The Desert Xpress and Maglev options could respectively reach costs in the neighborhoods of $5 billion or $12 billion to $15 billion. Neither side has announced a completed financing arrangement, and the Federal Railroad Administration has not yet approved environmental statements for either plan.

Those on the Desert Xpress side assert that they can accomplish their project with private funding – although they may seek a federal loan – and can begin construction well before a Maglev line could happen.

Desert Xpress executives expect to make an announcement in about one month regarding a major investor for their project, Stone said. He said those talks are confidential.

It would be interesting to see who that major investor is. The article mentions that China’s Export-Import Bank has offered $7 billion to the maglev project, money that would seem better suited to DesertXpress, given the low probability that maglev will ever be built along this corridor.

Still, I’ve always been impressed by the quality of the proposal and the team behind DesertXpress, and I would not doubt Tom Stone when he says he is on course to line up the funding and break ground in 2011. Let’s hope he is successful, because construction on Vegas HSR would only benefit the cause of SF-LA HSR.

Wilshire bus lane draft environmental report is now online (Source: thesource.net)


Wilshire bus lane draft environmental report is now online

The map shows one alternative studied for the bus lane project. Staff from Metro, in partnership with the city of Los Angeles and the county of Los Angeles will recommend the best alternative for the project later this year.

The draft environmental impact report for the Wilshire peak period bus lane project has been released and is now posted online. It’s a big step toward completing the project, which Metro officials hope will happen in mid- to late 2012.

Here’s a post from last week that explains the project, which would add rush hour bus lanes to about 9.7 miles of Wilshire Boulevard in the city of Los Angeles and cut bus travel times significantly, according to Metro officials.

The draft environmental study is very long, as these things always are. Public meetings are now scheduled to discuss the report — I’ve posted them after the jump.

Below are what I think are a few key paragraphs that help explain the purpose of the project, which has often been overlooked because of the hoo-ha surrounding the planned Wilshire subway extension:

With increasing average daily traffic volumes on Wilshire Boulevard, demands for viable alternatives to the automobile have increased as congestion continues to slow automobile travel. This same congestion also slows buses, increasing travel time, and reducing schedule reliability for transit customers, while increasing operating costs for Metro. Average bus speeds, along with automobile speeds, have declined steadily over the past 20 years. The Wilshire BRT Project is intended to further improve bus passenger travel times, service reliability, ridership of the existing Wilshire BRT system, and encourage a shift from automobile use to public transit.

Metro’s Metro Rapid Program provides fast, frequent regional bus service throughout Los Angeles County. Key features of Metro Rapid include simple route layouts, frequent service, fewer stops, low-floor buses to facilitate boarding and alighting, color-coded buses and stations, and traffic signal priority.

The program’s success has garnered national acclaim from both the federal government and major transit providers. Launched in June 2000, the Wilshire/Whittier Metro Rapid Line 720 was one of the first two Metro Rapid Bus Rapid Transit (BRT) lines to be implemented in Los Angeles County. It demonstrated that by implementing a few key attributes as mentioned above, passenger travel times could be reduced by as much as 29% and ridership increased by as much as 40%.

Metro Rapid Line 720 currently serves Wilshire Boulevard from 4:00 a.m. to 1:00 a.m. weekdays, with service every 3 to 4 minutes during the peak hours. There are currently 51 buses operating during the peak periods on Metro Rapid Line 720. Wilshire Boulevard is also served by Local Line 20 and Metro Rapid Express Line 920. Local Line 20 operates 24 hours a day with service every 6 minutes during the peak hours, and up to 29 peak buses. Metro Rapid Express Line 920 operates every 6 to 7 minutes during the weekday peak hours only. The same level of service along Wilshire Boulevard is planned post implementation of the Wilshire BRT project.

Construction of the proposed Wilshire BRT project would not only assure the corridor’s immediate and long-term success as a BRT facility but would further enhance all transit services along Wilshire Boulevard. When implemented, bus passenger travel times are expected to further improve by an average of 24%. Average Metro Rapid bus speeds are projected to increase by an average of nearly 32%. Up to a 10% mode shift from mixed flow to bus use is projected.

The draft study also looks at impacts on traffic flow along Wilshire that would result from the bus lanes. Generally speaking, most of 74 intersections along or near Wilshire would not be significantly impacted, but it would take motorists longer to get through nine of the intersections that can’t be fully mitigated.

Here’s the list of upcoming public meetings:

Monday, June 21 6-8pm [Add to Google Calendar]
Westwood Presbyterian Church
10822 Wilshire Bl, Los Angeles
Parking is available in the surface lot.
Served by Metro lines 20, 720 and 920.

Tuesday, June 22, 6-8pm [Add to Google Calendar]
Good Samaritan Hospital, Moseley Salvatori Conference Center
637 Lucas Av, Los Angeles
Parking is available in the lot on Lucas Av, between 6th St and Wilshire Bl. Parking is not validated, and costs $8.
Served by Metro line 20.

Tuesday, June 29, 2-4pm [Add to Google Calendar]
Wilshire United Methodist Church
4350 Wilshire Bl, Los Angeles
Parking is available in the surface lot.
Served by Metro Line 20.

Wednesday, June 30, 6-8pm [Add to Google Calendar]
Felicia Mahood Center
11338 Santa Monica Bl, Los Angeles
Street parking is available on Corinth.
Served by Metro Line 4 and 704.

ADA Requirements: Special accommodations are available to the public for Metro-sponsored meetings. All requests for reasonable accommodations must be made at least three working days (72 hours) in advance of the scheduled meeting date. Please telephone the project information line at 213.922.2500. Our TDD line is 1.800.252.9040.

A copy of the Draft EIR/EA is available at metro.net/Wilshire and at public libraries in the study area.

Public comments on the Draft EIR/EA will be accepted through July 26, 2010. You may submit your comments:

Friday, June 11, 2010

Blue Line cuts across L.A. County's invisible boundaries (Source: LA Times.com)

Link: http://www.latimes.com/news/local/la-me-blue-line-20100609,0,860045,full.story

COLUMN ONE

Blue Line cuts across L.A. County's invisible boundaries

The oldest light-rail line is a rolling improv theater with a lively cast of characters running 22 miles from Long Beach to downtown L.A.

Blue Line

Marcia Baker, 21, gives her boyfriend, Ramon Diaz, 20, a kiss while riding the Metro Blue Line. L.A. County's oldest light-rail line runs 22 miles from Long Beach to Los Angeles. 
See full story (Genaro Molina / Los Angeles Times)


 

They are strangers on a train. Text-messaging businessmen and hawkers selling pirated DVDs, cotton candy and drugs. Teenage mothers pushing strollers and weary scavengers with strollers heaped with cans and bottles. Students quietly reading textbooks and proselytizers shouting passages from the Bible.

There is the blind man who takes out his glass eyes for money and the tightly coiled gangbangers with whom direct eye contact is not advised. Commuters lost in their iPods next to full-throated yakkers broadcasting personal confessions.

The Metro Blue Line cuts up the middle of Los Angeles County, from Long Beach to downtown, like a surgical incision, exposing an element of the metropolis many never see.

In a place dominated by freeways and the automobile's numbing isolation, the 22-mile light-rail line — the oldest in L.A. County, marking 20 years of service this summer — is a rolling improvisational theater where a cast of thousands acts out a daily drama that is by turns poignant, sad, hysterical and inexplicable.

Whoa! Did a guy just get up from his seat and urinate before stumbling off the train?

Yes, folks, he did.

Five bucks gets you a day pass to one of the most unpredictable shows in town.

In South Los Angeles, the Blue Line's doors open and a wiry homeless man lugging a bedroll collides with a very large woman as they step aboard. He is white, she is black and both explode into expletives.

"That's three times I've been assaulted in the last hour by a black person!" the man roars.

"Just because you're white ... you got a lot of nerve!" the woman shouts.

"I'm calling the sheriff!" the man howls. "You're going to jail! In handcuffs!"

Tension fills the standing-room-only car. Vaughn Gregory stands up, reaches into his fanny pack and begins shooting.

Video.

"How many times have you been assaulted by black people today?" Gregory asks, pointing his phone's camera at the man. "Is it because you're white or is it because you're smelly?"

"Shut the ... up!" the man growls.

"Don't interrupt this interview," Gregory barks. "You're going be a star on YouTube tonight."

The train is now full of laughter. Gregory, 34, sits down to review his film and finish his commute to work at a downtown grocery.

"I stay equipped," he says, pulling a small still camera from the fanny pack. "Because there's always something happening on this train."

Attention all patrons...

The disembodied voice telling riders what they cannot do on the Blue Line is a constant companion. Signs galore warn of prohibitions under Section 640 of the Penal Code, subject to a $250 fine: No entry without valid fare. No littering. No smoking. No spitting or chewing gum. No skateboarding. No loud or rowdy activity. No in-line skating. No playing of sound equipment. No eating or drinking.

Jimmy Jules is dragging a cooler full of bottled water through the train, working the crowd like a baseball stadium vendor.

"Water, water, water, water," he says with an accent of his native Haiti. "Getcha water. Getcha water."

No one needs to go thirsty or hungry on the Blue Line. The trains are lousy with people selling water, candy and peanuts. They work the train front to back before letting it sail off like a ship leaving port; then they grab one going the opposite way.

"There's no jobs out there. It's hard," says Jules, 25. "I didn't want to be sitting around doing nothing." His girlfriend is expecting a baby. He has worked the rails for three months and nets about $80 a day.

When he gets collared by sheriff's deputies who patrol the trains, he pleads his case. "I say, 'Listen man, you're doing your job and I'm doing mine. What do you want me to do? Robberies?' "

The Blue Line rumbles through a section of the county that's on nobody's star map. Through unglamorous neighborhoods of industry. Past rail yards, scrap yards and the dirt yards of sun-baked homes in Compton, Watts and South-Central.

Entrepreneurs follow the train like pilot fish. They ride from station to station emptying garbage cans of recyclables. They sell costume jewelry, incense, watches, toys and CDs. They hang out at stations soliciting used tickets and reselling them at a discount.

"You — hanging out on the walkway!" a voice scolds one ticket hustler over a loudspeaker. "You need to leave. The sheriff's on his way."

No need to walk the streets of downtown's Fashion District looking for pirated DVDs. On the Blue Line, the pirates come to you. The going rate is one DVD for $5, three for $10 and seven for $20.

"You got 'Iron Man 2'?" a passenger asks a young man moving through the train with a backpack weighed down with DVDs.

"Naw, I'm all sold out," he answers. "But I'll be getting some more later on today. You gonna be riding later?"

"Iron Man 2" opened in theaters later that week.

"A lot of these guys sell you stuff, and you can hear people laughing and babies crying in the background," says Arlene Valdez, a passenger who buys only from a trusted source: a man with a jet black ponytail who says his name is Joe. He carries a portable DVD player to assuage skeptics.

"His quality is best," Valdez says, buying "Astro Boy" for her son.

Joe gets off at the Florence station and explains that, like Jules, he began selling movies after being laid off from a sales job. "I was embarrassed," he says. "But I had bills to pay."

On the other end of the platform, two men are talking and exchanging money. One is older, with gray stubble and a jaunty zebra-stripe hat. The other is younger and clean-shaven. He's wearing a brown work shirt embroidered with the name Paul.

The pair get on the next train to L.A — but not together. The Hat takes a seat, places a folded newspaper on his lap and pulls out three twist-off bottle caps. He places a nut under one of the caps and the game begins.

"Who's got 20?" The Hat says, his delicate fingers rotating the bottle caps as though they were in a centrifuge. "You can't win unless you make a bet."

Paul is willing and eager — as he is the next day on a different train.

He wins, he loses, he wins again. Eventually other gamblers jump in. Around and around the bottle caps go; where the nut is only The Hat knows.

"If I lose a dollar, I don't holler!" he shouts. "If I lose, I never cry the blues!"

They've taken over a corner of the train car. A dozen gamblers are hollering, laughing, egging each other on. Jacksons are flying. Paul isn't playing anymore. At each stop he pokes his head out the door and scans the platform.

"You want a chance to get even?" The Hat asks a man who has lost a wad. "Don't be scared! A scared man don't win!"

Neither does a bold man.

At the Washington station, Paul and The Hat slide off just as the train doors close. On the platform, they put on a little show for the suckers. "Show me how you did that," Paul asks. Then the train departs and the grifters walk off in opposite directions.

Serendipity is the Blue Line's lifeblood. Within its slender frames of steel and glass, fragmentary images and snippets of dialogue come together to form a visceral mosaic of life.

Listen to the phone conversation of a giggling teenage girl carrying a Hello Kitty lunch box as she recounts a recent night that involved a stolen car, guys "strapped with guns," a misplaced shotgun and her mom's no-good, ex-con boyfriend.

"He treats people on the outside like he's still on the inside," she says.

Watch the agitated man with manicured nails and half his teeth rise from his seat and dance in the aisle.

"People think I'm weak because I got me a cane. But I work out! I work out for a living!" He stops, bends at the waist and touches the back of his hand to the floor. "You know a 60-year-old man who can do this?"

Pity the worn-out woman with frazzled hair and misapplied lipstick who holds a bouquet of dead flowers and coos to a teddy bear swaddled in a baby blanket.

"He represents a guy I used to live with in South-Central," she says.

Nod in agreement with the man wearing seven wristwatches, a spray-painted yellow hat and a red windbreaker adorned with the face of Colonel Sanders cut from a bucket of chicken.

"I'm writing a book with all the answers," he says. "I'm a soldier for God. Special Forces level."

Hand a few bucks to the beggar who goes from car to car explaining the golf-ball-sized divot in his forehead.

"Two cholos with guns," he says. "The bullet is still inside."

The cast of characters changes with each boarding — nearly 78,000 a day, more than 2 million a month.

"I've seen all the greats," a black man in his 50s says to a stranger sitting across from him, a white man in his 60s. " Wilt Chamberlain. Lew Alcindor."

The conversation begins with basketball's greats and careens on an improbable path: Careers, politics and travel. Wives, ex-wives and a Filipino mistress. Health problems, the CIA and Vietnam. Nixon in China and family in prison.

Half a dozen stops later, the men step off the Blue Line in Long Beach.

"It's been nice talking to you," the black man says. "I apologize because I do run my mouth."

"We all do," the white man says.

"My name is Steve."

"Roger."

"Pleased to meet you, Roger," Steve says, extending his hand. "I like meeting an intelligent man."

And the two part ways, strangers no more.

mike.anton@latimes.com